Representative projects for the Department of Veterans Affairs, U.S. Border Patrol, the public overlook at the Mt. Morris Dam, and the fort barracks on Governors Island.

01

Buffalo V.A. Medical Center

Dept. of Veterans Affairs

Multi-trade work at an active medical campus: concrete and the front entrance reconstruction, stud framing, drywall, ceilings, paint and flooring, plus retaining and stone walls on the surrounding site.

Location
Buffalo, New York
Scope
Concrete, entrance, framing, drywall, ceilings, paint, flooring, site walls
Conditions
Occupied healthcare facility; phased access, infection-control and patient-traffic constraints
Steel stud framing inside an occupied facility
Fig. 02 — Interior framing, occupied facility
02

Long Island V.A. Medical Center

Dept. of Veterans Affairs

A concrete-only package covering campus sidewalk replacement and associated flatwork, executed roughly 400 miles from our Buffalo base. The project our out-of-region mobilization is measured by.

Location
Long Island, New York
Scope
All concrete work, primarily sidewalks and pedestrian flatwork
Conditions
ADA-compliant grades and cross slopes; walkways kept open to campus traffic
New concrete sidewalk sections curing beside a work truck
Fig. 03 — Sidewalk replacement, Long Island
03

Mt. Morris Dam — Upper Look Area

Public overlook

Site work and concrete at a public overlook serving the Genesee River gorge: grading, drainage and cast-in-place walks, walls and pads built for public use and seasonal exposure.

Location
Mount Morris, New York
Scope
Site work and concrete at the Upper Look Area
Conditions
Public-access site; seasonal weather exposure
Crew setting structural steel from a lift at the Mt. Morris overlook
Fig. 04 — Structural work, Mt. Morris
04

Governors Island — Fort Barracks Restoration

National Monument site

Restoration work on part of the fort barracks in New York Harbor: historic-fabric repair on a National Monument site, with every material and detail approved before installation. All labor, equipment and materials arrived by ferry on a scheduled window, which set the pace of the whole job.

Location
Governors Island, New York, N.Y.
Scope
Restoration of portions of the fort barracks
Conditions
Ferry-only logistics; preservation review; public-access island
Structural steel frame under construction on Governors Island
Fig. 05 — Governors Island, New York Harbor
05

Border Patrol Stations — Northeast New York

U.S. Border Patrol

A multi-year, multi-site renovation program across the North Country, including one full building build-out. Work ran at secured, staffed stations on 24-hour operations, which meant tight phasing, escorted access and no unplanned outages.

Location
North Country, New York
Scope
Bathroom renovations, framing, drywall, paint, flooring, windows and openings; concrete, asphalt, commercial EPDM roofing, standby generators, plumbing, electrical, heating
Conditions
Secured, staffed stations on 24-hour operations; escorted access; no unplanned outages

Lake Champlain

Full build-out

Ogdensburg

Trout River

Chateaugay

Rouses Point

Mooers

Finished interior of a Border Patrol station with reception desk
Fig. 06 — Finished interior, Border Patrol station
Exterior of a Border Patrol station in northern New York

Start your next project with us

Concrete and sitework packages, and multi-trade renovation of occupied buildings — from $300K day-to-day scopes up through the $1M–$3M range.